Project Number
A080314
Designer
Anthony Freeman
Client
Nardia Plumbing
Architect
Cox Rainer
Builder
John Holland Group
Value (Build Cost)
$ 80 Million
Hydraulics Contractor
Nardia Plumbing
Project Duration
March 2008 to December 2009
Innovations
Pre-fabricated bathroom pods were built off site
A heat trace system was used to maintain the heat within the hot water services in lieu of a secondary piped circulating system
Grey water from waste fixtures was treated and re-cycled for irrigation
Specific Challenges
The pre-fabricated batroom pods where manufactured in Italy and did not comply with Australian plumbing standards. Alterations where reuired to be made to each pod to achieve plumbing approval
Services Documented
- Cold Water Service,
- Hot Water Service,
- Fire Hydrant Service,
- Fire Hose Reel Service,
- Gas Service,
- Sanitary Drainage and Plumbing,
- Downpipes and Gutters
- Stormwater Drainage